Home
Documents and Lists
Create
Site Settings
Help
Up to GSI Client Project Portals
PM Routines Library - BETA SITE (In Development)
PM Routines Library
: Door, Overhead, Roll-up, electric, up to...
New Item
|
Edit Item
|
Delete Item
|
Alert Me
|
Go Back to List
Title:
Door, Overhead, Roll-up, electric, up to 24’ high x 25’ wide
Level 1 Major Group:
B: SHELL
Level 2 Group:
B20 Exterior Enclosure
Level 3 Individual Elements:
B2030 EXTERIOR DOORS
Frequency:
Annually
Preventative Maintenance:
1. Check with operating or area personnel for deficiencies.
2. Check for proper operation, binding or misalignment; adjust as necessary.
3. Check and lubricate door guides, pulleys and hinges.
4. Inspect and lubricate motor gearbox, drive chain (or belt), and motor; adjust as necessary.
5. Check operation of limit switch; adjust as necessary.
6. Check electrical operator, wiring, connections and contacts; adjust as necessary.
7. Clean area around door.
8. Fill out maintenance checklist and report deficiencies.
Safety Warnings or Special Precautions:
Tools & Materials Required:
Attachments:
Created at 5/30/2008 3:16 PM by
Anna Carey
Last modified at 5/30/2008 3:16 PM by
Anna Carey