Logo Home   Documents and Lists   Create   Site Settings   Help    Up to GSI Client Project Portals
Icon
PM Routines Library - BETA SITE (In Development)
PM Routines Library: Door, Fire Doors, Overhead
   
New New Item
|
Edit Edit Item
|
Delete Delete Item
|
Alert Me
|
Go Back to List
Title:
Door, Fire Doors, Overhead
Level 1 Major Group:
B: SHELL
Level 2 Group:
B20 Exterior Enclosure
Level 3 Individual Elements:
B2030 EXTERIOR DOORS
Frequency:
Quarterly
Preventative Maintenance:
1. Check with door operating personnel for deficiencies.
2. Drop test heat activated or fusible link roll up fire door.
3. Inspect, clean and lubricate door gear assembly.
4. Check alignment of overhead door guides, clean and lubricate.
5. Inspect general condition of door for need of paint and repairs.
6. Replace missing or tighten loose nuts and bolts.
7. After maintenance clean around door and ensure access.
8. Fill out maintenance report.
Safety Warnings or Special Precautions:
Tools & Materials Required:
Attachments:
 
 
Created at 5/29/2008 1:45 PM by Anna Carey
Last modified at 5/29/2008 1:45 PM by Anna Carey